+35 years of expertise
Since 1989, we are operating in Korea and help design, build, repair, and maintain all types of structures in Korea.
Based on excellent technology and technicians, we support projects as an excellent partner providing total services such as Structures, Cables, Post-tensioning, Precast Concrete, Heavy-Lifting and Repair&Maintenance.under the principles of innovation and sustainability.
-
7,300employees worldwide
-
+ 150Employees in Freyssinet Korea
Our capabilities in new build
Bridge Construction Technology
Based on its advanced technology, Freyssinet Korea has been leading the construction of various cable-stayed bridges, including cable-stayed bridges, ED bridges, and arch bridges in Korea. We will continue to take the lead in bridge construction that prioritizes the safety of our customers by adding maintenance management technology as well as construction technology.
Post-Tensioning
Freyssinet Korea will introduce PT to building slabs to maximize space utilization by reducing and eliminating interferences, and also strive to improve economic efficiency.
Precast Concrete
Based on construction experience with various precast methods such as TechSpan, TechBOX, Techwall, and PC Slab, Hurecine Korea will do its best for quick and safe construction.
Heavy Lifting
Freyssinet Korea is working with Hebetec to provide integrated solutions for heavy lifting with expertise and know-how.
Our capabilities in repair
Repair & Maintenance
Freyssinet Korea has contributed to the extension of the lifespan of social infrastructure by applying advanced maintenance and reinforcement methods based on advanced inspection and diagnosis technology, and is striving to develop maintenance technology through continuous technological development.
A fully total service
How we do it?
01. Identification
We start by understanding your project’s needs and challenges. Our team identifies key structural and environmental factors to establish a tailored approach for your project.
02. Execution of Works
Our skilled teams execute the project with precision, leveraging Freyssinet’s world-class technology and methodologies to deliver reliable and timely results.
03. Maintenance & Monitoring
Our commitment doesn’t end at project delivery. At the client’s request, we offer ongoing monitoring and maintenance to extend the lifespan and ensure the continued safety of your structure.
04. Applying developed solutions and leading standardization
We apply developed solutions in the field and continuously research more advanced access technologies and solutions, leading technology standardization.
Our references
Seohae bridge
Geogeum bridge
Saemangeum Dongjin bridge
Samcheon bridge
Mankyeong bridge
Magok MICE CP1
Magok MICE CP3-2 BL
Magok CP4 BL
BIFC 3rd
Ksquare Data center
Heaeundae woodong complex
Goyang-Hyangdong 9BL Office
Samsung-Pyungtak P4_Ph1
Cheongla Ti amo
Suwon-kwangMyeong Expressway
Total length :3,125m
(U-type : 565m, TechSpan : 2,560m)
Gyhyun underpass
Total length :720m
(Techwall : 549m, TechBox : 171m)
Seobu Expresswlay Lot 1, 2
Lot 1 : 7,186m (70,101m2)
Lot 2 : 8,074m (74,852m2)